Zero to 100 project of hot rolling sheet production line of Isfahan Steel Factory

Input material: slab 200 mm thick steel

Product: sheet Sheet with a thickness of 12 mm and above and with a width of 800 to 1200 mm

Project location: Isfahan, Shtarjan Industrial Town, Fifth Street.

نورددد 22
1- Preparation of location map of equipment, products and raw materials
1طراحی خط

2- Step preheat oven ( Walking hearth) with a capacity of 30 tons per hour, slabs with an opening of 5.5 meters, including:

calculation, design, map Construction, construction, installation, implementation of foundation, start-up and operation of hydraulic and mechanical movement system, charge and discharge system, metal frame, fireproofing, smoke exit system and recuperator, chimney

پیش گرم

3-Rafting stand shelf including:

Foundation implementation (calculation and implementation)< /strong>

reducer gear (calculation, supervision of purchase, renovation, installation and operation)

synchronous gearbox (calculation, design, construction, installation and operation)

Couplings (calculation, supervision of purchase, renovation, installation and operation)

locks , bearings, bearings and shoes (calculation, design, construction, installation and operation)

Scrodan System (including screws, nuts, gearbox and motor) (calculation, design, manufacturing, supervision of casting and purchase, installation and operation)

sideguide ( calculation, supervision of purchase, renovation, development, installation and operation)

stand body (calculation, design, supervision of casting, machining, manufacturing, installation, and operation)

 

 

22رافینگ

33رافینگ

44رافینگ

66رافینگ

4- Roller tables include: Rolls (calculation, design, construction, supervision of machining, installation and operation) Engines (calculation, purchase supervision, cooling system modification, installation, electrical system supervision and operation) Tables (calculation, design, construction, installation and operation)

 1رولیک

2رولیک

3رولیک

5-Edger round vertical stand including: Calculation, supervision of purchase, mapping, modification of screw system, modification of roller movement system, implementation of foundation, installation and operation

edger 1

edger 2

edger 3

edger 4

6- Finishing stand shelf including: Calculation, purchase supervision, mapping, reconstruction, gearbox modification, foundation execution, installation and operation

 finishing 1

finishing 2

finishing 3

7- Smoothing 9 rollers including: Calculation, purchase supervision, mapping, movement system modification, foundation implementation, installation and operation

صافکاری11

8- Scissors include: Calculation, purchasing supervision, mapping, hydraulic system modification, foundation implementation, installation and operation


قیچی1

9- Cooling bed and packaging including: Calculation, supervision of purchase, mapping, increase of area, improvement of ventilation and cooling system, implementation of foundation, installation and operation

 

بستر خنک کننده 1

بستر خنک کننده 2

بستر خنک کننده 3

بستر خنک کننده 4

بستر خنک کننده5

10- Peeler includes: Mechanical peeling (calculation, supervision of purchase, mapping, repair and reconstruction, modification of the electrical system, implementation of the foundation, installation and operation) Hydraulic peeler (calculation, design, construction, installation on the body of the stand and operation) 11-Sunny's electricity Monitoring the implementation of power supply systems including power (panels, transformers and cabling)   Designing the mechanism and supervising the implementation of furnace automation control, rollers, operator tables, heated scissors and bed